Recent Installs

Recent outdoor learning, active & play area installs

Irthington Village School, Cumbria

Requirement:

The school required an all weather track around the perimeter of the school field along with an access path from the playground to the track

Solution:

Installation of a 229.9m Daily Mile track at a width of 1.2m, 7 laps of the track equates to the target distance of 1 mile. An 18m access path connecting the track to the playground was also installed.

Customer Comment:

"We have recently had a mile track installed on our school field, which the pupils and staff are all very excited about. From the moment that the Edspace staff arrived on site they were polite, courteous and very professional. They kept us informed of their progress and the various processes involved throughout the entire installation, seeking to reassure us at every opportunity. They were not deterred by the inclement weather, when it appeared, arriving early in the mornings and working late into the evenings to ensure that the work was completed within the timescale given and to a high standard. We would highly recommend Edspace as a company and would utilise their services in the future if undertaking other outdoor play area projects". 

Lynne Lawson
Administration & Finance Officer

     

 

Livingstone Primary & Nursery School, Barnet.

Requirements:

The school required some additional play space and had identified a sloping area of grass adjacent to the playground to develop.

Solution:

A mini MUGA was suggested to provide an additional enclosed ball games area. The existing sloped grass area was removed and a retaining wall installed to provide a flat and level space along with a sports fence enclosure. A rubber polymeric sports surface was installed to complete the project.

View Multi Use Games Area

Brats Day Nursery, Corby.

Requirements:

The customer had an existing mulch play surface which was causing staining to the children’s clothes due to the release of carbon black from the rubber shred used, and required a solution to stop this from happening. 

Solution:

Edspace levelled the existing surface and dealt with some soft spots due to settlement of the base-works and installed a new artificial grass surface, using the existing mulch surface as a shockpad under the grass.

“Amazing job done, professional, friendly and fab quality”
Kerry McClymontBrats Day Nursery, Manager

View Artificial Grass

Charles Darwin Primary School, Northwich.

Requirment:

The school required an all weather facility to suit the Daily Mile and support PE classes.

Solution:

Installation of a 229.9m track at a width of 1.2m, along with an integral 60m 6 lane multi colour sprint track 

View Daily Mile Tracks

Castlewood Primary School, Southwater.

Requirements:

Remove existing artificial grass track, and replace with blue wet-pour rubber daily mile track.

Solution:

Edspace installed a 1.3m wide, 197.6m Daily Mile Track with blue wet-pour rubber surfacing. This track was designed to run around the perimeter of the school field and requires 8 laps to complete the challenge distance of 1 mile. 

“Our thanks to you for making the installation very seamless and efficient. Your group of installers were a pleasure to have on site.”
Sue Barnard School Secretary, Castlewood Primary School

View Daily Mile Tracks

Thomas Willingale Primary, Loughton.

Requirement:

Update required to an existing overgrown pond & garden area.

Solution:

Break out and remove pond, cut back overgrowth and prepare existing ground. Install new sensory path winding around the garden and form new planting beds and raised timber planters along with a new canopy, area of artificial grass and bound forest floor surfacing